忘忧草社区在线观看视频,春暖花开性8论坛新版入口,角头1电影在线看免费,福利天堂社区论坛入口,丁香五月天图片区小说区,欧美2025hd变态,午夜免费1000集757,亚欧综合免费视频在线观看完整版

Shenzhen Grande Electronic Linkedin Page
Shenzhen Grande Electronic Co., Ltd logo
E-mail us for a Quote:
sales88@greattong.com
Call us now:
+86-755-83261869

Home > Products


Data Collecting System PCB Manufacturing and Assembly - Grande

Time:2021-03-25 17:32:52 Click:

Supplier: Grande Electronics

Layers: 4
Application: Data Collecting System PCB Manufacturing and Assembly - Grande

Assembly types: DIP and wave soldering
Surface Treatment: ENIG
Packing: Anti-static bag and single packing
PCBA Lead time: 3 -4 weeks
 
  


 

 

Description:

1,Turnkey solution for Data Collecting System PCB Manufacturing and Assembly - Grande
2, PCB Assembly, PCB fabrication / PCB layout, PCB Reversing.
3, Electronic Contract Manufacturing.
4, SMT&DIP&PTH&BGA.
5, Components Sourcing.
6, Quick PCBA prototype.
7, X-ray test, the Internal Circuit Test (ICT), Functional Circuit Test (FCT)
8, Sample and small batch order are accepted.

PCBA Service
Customer offers: Gerber file, PCB Specification, BOM and Assembly Drawing.
Full-turnkey PCBA: 1-30Layers PCB, Components Sourcing, SMT, PCBA testing, PCBA Aging test, PCBA Packing and PCBA Shipping.

PCBA Quality Assurance
1, Certifications: UL, SGS, TUV, BV, ROHS, ISO9001: 2008, TS16949: 2008 
2, 7 lines dust-proof SMT lines and DIP lines.
3, All line works wear anti-static and dust-proof clothing.
4, All operators should pass strictly training before they start work.
5, SMT Equipment: solder paste printer in Jidakang,, Mounter in Panasonic, Re-flow, Wave Soldering, Semi-auto DIP
6, PCBA Test Equipment: ORT, Constant temperature and humidity chamber,3D CMM,X-Ray.
7, PCBA Test: ICT, Functional Circuit Test and X-ray test.
8, Package Processed: 
0402, 0603, 0805, 1206, 1608, 2125, 3216
Micro QFP 0.2mm
Flip-chip, BGA, Connectors
BGA Ball Pitch=0.2mm
9, Each workstation in accordance with the SOP 
10, Materials: FR-4, FPC, Aluminum,High TG,Halogen-Free, HF, CEM-1, CEM-3, FR-1, 94-V0 and so on.
11, Material Brand: KB, SHENGYI, NANYA and so on. 

PCBA Lead Time
PCBA prototype: 7-10 working days after contract signed and EQ confirmed. 
Mass production: partial delivery according to the customer’s requirement.

Other information for PCBA
1, The mass production will be arranged after PCBA prototype confirmed. 
2, Use Teflon adhesive tape to protect Mount Holes and GND Holes.
3, EPE is used to avoid impact and crash.

PCBA Standard Packing
Anti-static bag and compartmental packing

Previous:Internet of Thing (IoT) All-In-One PCB Assembly | Electronics Manufacturing

Next:Communication Equipment Full Turnkey PCB Assembly- EMS Grande

 
Home About Us Services Quality Pb-Free News Contact Us


Copyright ® 2017,Shenzhen Grande Electronic Co., Ltd. All Rights Reserved. English 中文站 Sitemap

忘忧草社区在线观看视频,春暖花开性8论坛新版入口,角头1电影在线看免费,福利天堂社区论坛入口,丁香五月天图片区小说区,欧美2025hd变态,午夜免费1000集757,亚欧综合免费视频在线观看完整版